digest:Using low-e double silver-plated glass wall Four-pipe fan coil system. Chilled water and hot air are set independently of the supply and return piping and circulating pumps. Every floor has about 50 fan coils, Schindler S7000 series of high and low areas of the six, a total of 12 units.

 Project Description:
 Using low-e double silver-plated glass wall Four-pipe fan coil system.  Chilled water and hot air are set independently of the supply and return piping and circulating pumps.  Every floor has about 50 fan coils, Schindler S7000 series of high and low areas of the six, a total of 12 units.

Peripheral support:
 Building is located in the central area of Chengdu Business Triangle, 14 banks, convenient traffic organization and shopping malls, leisure, dining and entertainments. Becoming more and more mature, "downtown business district" is attracting more and more international trading, financial companies to settle. One Aerospace Center, is located right in the heart of it.
 Traffic conditions:
 The central status of One Aerospace Center is irreplaceable.  Subway line 1 was completed in 2010. Line 2 will be completed in 2012.  It only takes 3 minutes to be Tianfu Square Station on foot, and takes less than 20 minutes to reach Shuangliu International Airport by car.
 
Specifications:
 1, the specific address: Chengdu Jinjiang Guanghua Street, the new No. 1, Zip Code: 610041
 2, floor and area: 42 floors, of which 24th is refuge floor; area of single floor is 2,300 square meters, total building area is 117,904 square meters
 3, elevators: 12 Schindler S7000 high speed lifts, six 6m/s lifts in the high-District, 6 3.5 m / sec lifts in the low-district. And there are the other two freight elevators
 4, air-conditioning: York four-pipe fan coil system, hot and cold self-control
 5, communication: high-speed fiber optic network, OFTA has set aside municipal pipeline connecting cable, wireless communication coverage
 6, fire: smoke, temperature sense detection, alarm system, fire sprinkler and pump system, fire hydrant system, gas fire-extinguishing systems and fire reports Broadcasting System
 7, water: double-loop power supply, two back-up generator 1350 kV
 8, ceiling clear height: 2.7 m
 9, security: access control systems, electronic anti-theft detection systems and CCTV systems
 10, the number of parking spaces and costs: 406 underground parking spaces, 400 to 600 yuan / month / months
 11, property management and cost: the Jones Lang LaSalle resident management fee, 22 yuan / square meter / month implementation
 12 :7-23 floor main building (lower area) ,25-42 (High Zone)
 13, floor load: office Average load 400 kg / square meter; equipment area average load of 800 kg / m
 14, power supply systems: the standard 110-watt power supply office space / square meter
 15, the design temperature / humidity: office 21-24.5 (Summer) ,19-22 (winter)
 16, the new air supply: office 50 cubic meters / hour / person
 17, The garage area has carbon dioxide concentration measuring devices.

 