Lippo Tower

Information Source:Hellobuilding.com
Refresh Time:2013-07-02 11:07:50

digest: Brand new Lippo tower is conveniently located in the business district in the heart of Chengdu, it is surrounded by U.S. and Germany Consulate offices, luxury shops, high-class restaurants, Sichuan University, and major banks. Close proximity to Chengdu Shuangliu International Airport (15mins), Chengdu Railway Station (15mins), and Chengdu exhibition center (10mins).

  Brand new Lippo tower is conveniently located in the business district in the heart of Chengdu, it is surrounded by U.S. and Germany Consulate offices, luxury shops, high-class restaurants, Sichuan University, and major banks. Close proximity to Chengdu Shuangliu International Airport (15mins), Chengdu Railway Station (15mins), and Chengdu exhibition center (10mins).

 

Project Address: No. 58, Kehua Road North, Chengdu 
Scope of Investment Attraction: domestic and foreign well-known corporate headquarters
Targets: headquarters of corporate groups and headquarters of Fortune 500 enterprises in China 
Investment Means: sale and lease
Description of Project: The project is located in Kehua Road North.
Project Status: it has been put into use, and well-known enterprises such as Caterpillar Chengdu Branch and Emerson Process Management Chengdu Branch have settled in the tower.
Project Environmental Advantages: the project is located in the center of Gaoshang Community in the south of the city, on Kehua North Road on the extended line of Hongxing Road, adjacent to the U.S. Consulate in Chengdu in the north, close to the 2nd Ring Road in the south and the business giant Bailian Tianfu Shopping Center. There are many bus lines crossing through the city, 15 minutes drive from Chengdu Shuangliu International Airport. The convenient transport conditions and superb geographic locations enable Lippo Tower to be gifted with superb geographic status, and become the links between the administrative office areas, new international convention and exhibition center as well as traditional business area.

Equipment Arrangement of Lippo Tower                                                    
Elevator: 24 originally imported Schindler elevators, highest configuration for the commercial building is S7000 type, with a clearance of 2.8m, noiseless,. CATV system, which are comfortable and luxurious.

Central air Conditioning: the host of air conditioner is the first international brand "Trane", measured household by household separately. The heat-cold self-regulation is provided around the clock throughout the year. Independent new air system has the temperature variation and dehumidification, clean installation and negative oxygen ion system.

Conference System: 4 +1 simultaneous interpretation, available for remote video conferences, cultural and art performances, fashion shows, large auction, product recommendations and press releases.

Building Automation System: it is a real building automation system, monitoring all the facilities and equipment in the building.

Office Automation System: the Building is equipped with high-performance local area network and access of telecom Internet, sharing the information resources of Lippo Building and proving the platform for the information exchange between the enterprises in the Tower.

Reduce the construction costs for settlement of enterprises. The business fields of enterprises shall be expanded.

Integrated Wiring System: the office building is the first to use the trunk 12-core 10G multi-mode fiber, Level 6, 1G fiber to the desktop. And the network equipment is equipped with 10G core and 10G trunk. Smooth and speedy information transfer is realized accordingly.

Access Card System: suitable for access control, attendance check, entertainment consumption, elevator, and parking card management

Visitor Intercom System: non-video intercom supporting with the access control to ensure the purity of office working.

Distance Measurement: water, electricity and gas can be measured and billed through three meters in a remote and household separating manner.

Power Supply: 10 kV HV special cable for power supply, accessed by municipal power grid; the emergency power supply is the emergency power supply power in accordance with national standards and design specification, with original imported generating units to ensure the lighting system of the entire building.

Security System: the all-directional digital network monitoring system shall be installed in such public areas as building basement, periphery, elevators and public areas of the tower, to realize the remote video functions. The two-technology alarm System and wireless electronic patrol system shall be adopted.

Communication System: four communication operators are introduced, China Unicom, Telecom, Netcom and Railcom, with advanced WLINE system, to realize the barrier-free network communications in the building.

Information Inquiry: the multimedia plasma display system shall be installed in the elevator to play the information in the building and for multi-media advertising. It is can be leased for media promotion. 

System Integration: Through the secondary software development, all systems are incorporated into a single management platform to realize the de facto system integration.

Fire System: the imported international brands of fire alarm systems are adopted to form an independent fire alarm and control center.

Water Supply and Drainage System: variable frequency pump system is adopted for water supply, and variable frequency pump tower-less constant pressure system, and the water supply pipeline shall be the PE pipe/PPR pipe or above-grade pipe. The water drainage is connected to the municipal water drainage networks, and the pipes shall be silent type UPVC pipe/ PE pipe.


Articles
Expert Adivces
Breaking News
Investing